Systems are falling into place. The first photo shows two new through hulls. The taped hole to starboard (on the right) is the raw water inlet for the toilet. The bronze one to port has been relegated to discharge for the LectraSan Type I MSD. The three intakes (engine, air conditioning/reverse cycle heat, and toilet) are to starboard.
The last photo is of the new Vetus raw water strainer for the engine installed above the water line and easily accessible.
0 comments:
Post a Comment