| Item | Accomplished |
| AC - move to location under V-berth | x |
| AC - rewire, replumb and revent | x |
| AIS - new | x |
| Anchor - new rode ( 5/16" HT chain & 200’ 5/8 braid) | |
| Aquadrive thrust bearing - new, install | x |
| Awnings - new | x |
| Battery - move house 8D under settee | x |
| Bilge - paint | x |
| Bilge pumps (3) - reinstall (one new high capacity) | |
| Bilge pump - rebuild cockpit Whale | |
| Bottom - strip, sand, fair, barrier coat (6 w/ West System additive) | x |
| Bulkheads - retab | x |
| Chainplates - remove old | x |
| Chainplates - fabricate and install new | |
| Chartplotter - new | |
| CO sniffer - new | x |
| Cockpit - traveler bridge drain | |
| Cockpit lazarettes - new gaskets | |
| Cockpit speakers - remove and glass in openings | x |
| Companionway doors - new | |
| Companionway steps - add nonskid | |
| Counter tops - new laminate | x |
| Curtains - new | x |
| Cutless bearing - new | x |
| Deck - repair separated spots | x |
| Deck - prime, paint (2-part poly), add nonskid | |
| Deck - new cleats, fuel filler, water filler | |
| Dinette - demolish settee for new | x |
| Dinette - build seating | x |
| Dinette - build table | |
| Dish locker - refurbish | x |
| Dodger - new skin | |
| Doors - refinish all | x |
| Engine - new | x |
| Engine - rebuild mounts and reinstall | x |
| Engine controls - remove old and glass in holes | x |
| Fiddles - new mahogany in galley | x |
| Fresh water system - relocate filer, pump, accumulator under settee | |
| Fresh water system - locate manifold behind forward drawer face | |
| Fuel filter - rebuild Racor 500fg (new seals) | x |
| Fuel system - relocate polisher control and new fuel gauge to old AC outlet | x |
| Fuel tank - new | |
| Genoa tracks - move from toe rails to positions near house | |
| Halyards - all new | |
| Hatch - rebuild forward | x |
| Hatch - new teak one in saloon to match forward hatch | |
| Hatch - companionway (new Plexiglas) | |
| Head - add AC GFI outlet | |
| Head - add combo faucet/shower wand | |
| Head - toilet rebuild | x |
| Head - install drain in floor to sump pump | |
| Head - rebuild cabinetry | |
| Head - redo counter top | |
| Headsail furler - new | x |
| Ice box - rebuild box, add insulation, rebuild lids | x |
| Instrument panel on seahood - build | x |
| Instruments - remove old and glass in openings | x |
| Instruments - new depth, speed, wind | |
| Keel - remove old coatings, apply epoxy and fabric, fair | x |
| Lifelines - all new | |
| Lights - LED (port, starboard, stern, steaming, tricolor, deck, spreader) | x |
| Lights - all LED below decks | |
| Lights - bilge | x |
| Mahogany below decks - varnish all | |
| Mast - refurbish including 2-part LPU paint | |
| Mast head - new wind instrument, VHF/AIS antenna | x |
| Overhead - sand and paint | |
| Propane tank locker - refurbish interior and teak cover | x |
| Pulpit and pushpit - new | |
| Radar reflector - new Tri-lens | x |
| Shaft seal - new PSS | x |
| Sole panel for dinette - build new | x |
| Standing rigging - all new | |
| Stern tube - cut out old and build new | x |
| Strainers - new raw water | x |
| Sump - new | x |
| Sump output hose - reroute | x |
| Switches - move master switches | x |
| Teak - strip and refinish | x |
| Topsides - replace delaminated spots, fair all, sand, prime | x |
| Topsides - paint (2-part LPU) | |
| Transom platform/ladder - build | x |
| Transom platform/ladder - install | |
| Trim tab on keel - remove and replace | x |
| Trim tab quadrant - remove all hardware | x |
| Through hulls - 2 new and refurbish four (cockpit drains) | x |
| Upholstery - new | |
| V berth - mahogany insert and new cushion | x |
| Water tanks - new port and starboard | |
| Wet locker - rebuild | x |
| Wheel - rebuild pedestal and remove trim tab clutch | x |
| Windlass - rebuild Ideal | |
| Wiring - new as necessary, label and bundle |