Monday, January 3, 2011

The more-or-less complete list of stuff to do

Item Accomplished
AC - move to location under V-berth x
AC - rewire, replumb and revent x
AIS - new x
Anchor - new rode ( 5/16" HT chain & 200’ 5/8 braid)
Aquadrive thrust bearing - new, install x
Awnings - new x
Battery - move house 8D under settee x
Bilge - paint x
Bilge pumps (3) - reinstall (one new high capacity)
Bilge pump - rebuild cockpit Whale
Bottom - strip, sand, fair, barrier coat (6 w/ West System additive) x
Bulkheads - retab x
Chainplates - remove old x
Chainplates - fabricate and install new
Chartplotter - new
CO sniffer - new x
Cockpit - traveler bridge drain
Cockpit lazarettes - new gaskets
Cockpit speakers - remove and glass in openings x
Companionway doors - new
Companionway steps - add nonskid
Counter tops - new laminate x
Curtains - new x
Cutless bearing - new x
Deck - repair separated spots x
Deck - prime, paint (2-part poly), add nonskid
Deck - new cleats, fuel filler, water filler
Dinette - demolish settee for new x
Dinette - build seating x
Dinette - build table
Dish locker - refurbish x
Dodger - new skin
Doors - refinish all x
Engine - new x
Engine - rebuild mounts and reinstall x
Engine controls - remove old and glass in holes x
Fiddles - new mahogany in galley x
Fresh water system - relocate filer, pump, accumulator under settee
Fresh water system - locate manifold behind forward drawer face
Fuel filter - rebuild Racor 500fg (new seals) x
Fuel system - relocate polisher control and new fuel gauge to old AC outlet x
Fuel tank - new
Genoa tracks - move from toe rails to positions near house
Halyards - all new
Hatch - rebuild forward x
Hatch - new teak one in saloon to match forward hatch
Hatch - companionway (new Plexiglas)
Head - add AC GFI outlet
Head - add combo faucet/shower wand
Head - toilet rebuild x
Head - install drain in floor to sump pump
Head - rebuild cabinetry
Head - redo counter top
Headsail furler - new x
Ice box - rebuild box, add insulation, rebuild lids x
Instrument panel on seahood - build x
Instruments - remove old and glass in openings x
Instruments - new depth, speed, wind
Keel - remove old coatings, apply epoxy and fabric, fair x
Lifelines - all new
Lights - LED (port, starboard, stern, steaming, tricolor, deck, spreader) x
Lights - all LED below decks
Lights - bilge x
Mahogany below decks - varnish all
Mast - refurbish including 2-part LPU paint
Mast head - new wind instrument, VHF/AIS antenna x
Overhead - sand and paint
Propane tank locker - refurbish interior and teak cover x
Pulpit and pushpit - new
Radar reflector - new Tri-lens x
Shaft seal - new PSS x
Sole panel for dinette - build new x
Standing rigging - all new
Stern tube - cut out old and build new x
Strainers - new raw water x
Sump - new x
Sump output hose - reroute x
Switches - move master switches x
Teak - strip and refinish x
Topsides - replace delaminated spots, fair all, sand, prime x
Topsides - paint (2-part LPU)
Transom platform/ladder - build x
Transom platform/ladder - install
Trim tab on keel - remove and replace x
Trim tab quadrant - remove all hardware x
Through hulls - 2 new and refurbish four (cockpit drains) x
Upholstery - new
V berth - mahogany insert and new cushion x
Water tanks - new port and starboard
Wet locker - rebuild x
Wheel - rebuild pedestal and remove trim tab clutch x
Windlass - rebuild Ideal
Wiring - new as necessary, label and bundle

0 comments: