The bottom has been stripped once with Soy Strip Marine. I followed the directions including putting plastic over the thick coating to prevent drying. It worked OK - nothing that three or four days of sanding won't finish.

Next up is to finish fairing and put a thin piece of cloth over the entire keel. I might add tape to the lead/fiberglass seam. I have sufficient epoxy on hand for a serious barrier coat. A final coat of S3 SilverTip primer will keep the UV off until it is time for bottom paint.
The drive train rebuild is about finished. A bit more paint and reinstallation of the waterlift muffler system, three bilge pumps, bilge alarm, and some hose will do it. The PSS shaft seal requires finishing off, as well.
0 comments:
Post a Comment